Evaluasi Kelayakan Ekonomi Pembangunan Jembatan Kali Sorong Menggunakan Metode Cost Benefit Analysis (CBA)

Author


Nadia Adawi Hidayatunnisa(1Mail), Fedya Diajeng Aryani(2), Baiq Virgia Srihayati(3),
(1) Program Studi Teknik Sipil, Fakultas Teknik, Universitas Gunung Rinjani,
(2) Program Studi Teknik Sipil, Fakultas Teknik, Universitas Gunung Rinjani,
(3) Program Studi Teknik Sipil, Fakultas Teknik, Universitas Gunung Rinjani,

Mail Corresponding Author
Article Analytic
  [File Size: 444KB]  Language: en
Available online: 2026-08-06  |  Published : 2026-08-06
Copyright (c) 2026 Nadia Adawi Hidayatunnisa
Article can trace at:

Article Metrics

Abstract Views: 32 times PDF Downloaded: 9 times

Abstract


The construction of the Kali Sorong Bridge aims to improve accessibility and support the smooth mobility of the community. Prior to project implementation, an economic feasibility evaluation is required to assess the balance between the expected benefits and the investment costs incurred. This study aims to evaluate the economic feasibility of the Kali Sorong Bridge construction using the Cost Benefit Analysis (CBA) method with the indicators of Benefit Cost Ratio (BCR), Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period (PP). The benefit components analyzed include travel time savings, travel cost savings, improved safety and comfort, reduced traffic congestion, and regional economic development. The cost components consist of land acquisition costs, planning costs, construction costs, and maintenance costs. The analysis results show a BCR value of 1.373, an NPV of IDR 794,410,335, an IRR of 2.46%, and a Payback Period of 19 years and 7.07 months. The BCR value indicates that the project's benefits exceed its costs, whereas the NPV and IRR values indicate that the project does not satisfy the feasibility criteria based on these two indicators. Therefore, the economic feasibility assessment of bridge construction projects should consider all evaluation indicators comprehensively to support more informed investment decisions.

Keywords


Cost Benefit Analysis, Benefit Cost Ratio, Net Present Value, Internal Rate of Return, Payback Period, bridge.

References


Abelson, P. (2020). A partial review of seven official guidelines for costbenefit analysis. Journal of Benefit-Cost Analysis, 11(2), 272293.

Asian Development Bank. (2013). Cost-benefit analysis for development: A practical guide. Asian Development Bank.

Asian Development Bank. (2017). Guidelines for the economic analysis of projects. Asian Development Bank.

Boardman, A. E., Greenberg, D. H., Vining, A. R., & Weimer, D. L. (2018). Cost-benefit analysis: Concepts and practice (5th ed.). Cambridge University Press.

Boardman, A. E., Greenberg, D. H., Vining, A. R., & Weimer, D. L. (2022). Standing in costbenefit analysis: Where, who, what (counts)? Journal of Policy Analysis and Management, 41(4), 11571176.

European Commission. (2021). Guide to cost-benefit analysis of investment projects: Economic appraisal tool for cohesion policy 20212027. Publications Office of the European Union.

Florio, M. (2014). Applied welfare economics: Cost-benefit analysis of projects and policies. Routledge.

Florio, M., Morretta, V., & Willak, W. (2018). Cost-benefit analysis and European Union cohesion policy: Economic versus financial returns in investment project appraisal. Journal of Benefit-Cost Analysis, 9(2), 147180.

Gray, C., Simanjuntak, P., Sabur, L., Maspaitella, P., & Varley, R. (2005). Pengantar evaluasi proyek. Gramedia Pustaka Utama.

Litman, T. (2021). Evaluating transportation economic development impacts. Victoria Transport Policy Institute.

Mishan, E. J., & Quah, E. (2020). Cost-benefit analysis. Routledge.

Uddin, M. N., & Rabbi, M. S. (2025). A meta-analysis of cost-benefit analysis outcomes in infrastructure projects: Evidence from transport and utility sectors in developing economies. Review of Applied Science and Technology, 4(2), 5986.

Valila, T. (2025). The economic impact of transport infrastructure: A review of project-level vs. aggregate-level evidence. Transport Reviews, 45(4), 459481.

Vickerman, R. (2007). Costbenefit analysis and large-scale infrastructure projects: State of the art and challenges. Environment and Planning B: Planning and Design, 34(4), 598610.

World Bank. (2020). Transport infrastructure and connectivity. World Bank.


Refbacks

  • There are currently no refbacks.

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.