Perbandingan Biaya dan Waktu Metode Permen PU No. 28 Tahun 2016 Dengan Metode Kontraktor (Studi Kasus: Proyek Student Apartement Building Block 1 (Female) UIII Depok)

Author


Muhammad Aqila Abimanyu(1Mail), Didiek Pramono(2),
(1) Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan, Universitas Gunadarma, Indonesia
(2) Jurusan Teknik Sipil, Fakultas Teknik Sipil dan Perencanaan, Universitas Gunadarma,

Mail Corresponding Author
Article Analytic
  [File Size: 210KB]  Language: en
Available online: 2024-03-25  |  Published : 2024-03-25
Copyright (c) 2024 Muhammad Aqila Abimanyu, Didiek Pramono
Article can trace at:

Article Metrics

Abstract Views: 132 times PDF Downloaded: 85 times

Abstract


The Ministry of PUPR makes a standard unit price of work by issuing the Minister of Public Works Regulation No. 28 of 2016. However, the total cost to be incurred is greater than the method used by the contractor. So the analysis of construction costs is needed as a means to improve the efficiency and effectiveness of development activities in the construction sector. Planning a project cost budget is one of the absolute activities before carrying out a development. The purpose of this final project is to calculate the Budget Plan (RAB) for the Student Apartment Building Block 1 (Female) UIII Depok project by using the Minister of Public Works Regulation No. 28 of 2016 and using the journal unit prices for construction materials and buildings in the Jakarta area. After being analyzed, the total costs that must be incurred for construction using the Minister of Public Works Regulation No.28 of 2016 on the Student Apartment Building Block 1 (Female) UIII Depok project are Rp. 63,180,745,237. As for the construction with the contractor method, it only costs Rp.44,211,810,456. When compared, the difference between the two methods is around Rp. 18,968,934,781 or 30.02%.


Keywords


Budget Plan, Work Unit Price, S Curve, PERMEN PU

References


Andi, E., “Analisis Anggaran Biaya Antara Metode SNI dan Kontraktor pada Proyek Pembangunan Rumah Sakit di Tangerang”, Jurnal Teknik Sipil, Vol. 1, Hal. 66-75, 2019.

Husen, A., (2009) Manajemen Proyek (Perencanaan Penjadwalan dan Pengendalian Proyek). Penerbit Andi, Yogyakarta.

Nggiku, U, Y., “Perbandingan Upah Tenaga Kerja Antara Kontraktor dan Permen PU 2016 Pada Pekerjaan Konstruksi Baja Proyek Gedung Fakultas Ilmu Pendidikan Universitas Tribhuwana Tunggadewi Malang”, 2018.

Peraturan Mentri Pekerjaan Umum dan Perumahan Rakyat Nomor 28/PRT/M/2016 Pedoman Analisis Harga Satuan Pekerjaan Bidang Pekerjaan Umum. Cipta Karya, Jakarta.

Putra, T.S., “Analisis Koefisien Produktivitas Tenaga Kerja pada Pekejaan Pasangan Dinding Dengan Bata Ringan”, 2020.

Sari, R.K., “Perbandingan Penggunaan Biaya Riil Pelaksanaan Dan RAB Berpedoman Permen PUPR Dengan RAB Proyek”, 2018.

Setiani, Y., “Perbandingan Kebutuhan Biaya-Waktu Pemakaian Alat-Alat Berat antara Hitungan Kontraktor dan Permen PUPR No. 28/PRT/M/2016”, 2022.

Soeharto, I. (1997) Manajemen Proyek. Erlangga. Jakarta.

Subagya. (2019) Analisis Manajemen Proyek. Penerbit Graha Pena, Bekasi.

Wahyuningtyas, A., “Perbandingan Analisis Harga Satuan Pekerjaan Dinding Proyek Royal Sentul Park”, 2019.


Refbacks

  • There are currently no refbacks.

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.