Author
Atifa Ambarwati(1
(1) Program Studi Teknik Sipil, Fakultas Teknik, Universitas Negeri Medan,
(2) ,
(3) ,
(4) ,
(5) ,
(6) ,
| Article Analytic |
Available online: 2025-10-10 | Published : 2025-10-10
Copyright (c) 2025 Atifa Ambarwati, Nalya Salsabila, Amirul Fadillah Siregar, Joel Alfian S Gulo, Wahyu Prayoga Ginting, Hendra Kurnia Pulungan
Article can trace at:
Article Metrics
Abstract Views: 46 times
PDF Downloaded: 24 times
Abstract
Keywords
References
Alzahrani, J. I., & Emsley, M. W. (2013). The impact of contractors attributes on construction project success: A post construction evaluation. International Journal of Project Management, 31(2), 313322.
https://doi.org/10.1016/j.ijproman.2012.06.006
Gao, Y. (2019). Teaching Technical Communication to Engineering Students: Design, Implementation, and Assessment for Project-based Instruction. Proceedings of the Interdisciplinary STEM Teaching and Learning Conference, 3(1).
https://doi.org/10.20429/stem.2019.030106
Mihret Dessie, W., Kassahun Bewuket, H., & Esubalew Tariku, M. (2022). Technical communication for civil engineering: academia-industry interdisciplinary needs. European Journal of Engineering Education, 47(5), 774792.
https://doi.org/10.1080/03043797.2022.2081532
Wilson, S. A. (2019). Understanding the Gap Between Communication in the Classroom and Com-munication During an Industrial Internship.
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.








