Efektifitas Metode Pelaksanaan Erection Struktur Baja Menggunakan Alat Bantu Box I Studi Kasus Proyek Pembangunan Lapangan Petanque Unesa

Author


Mochamad Yusuf Al Ghozy(1Mail), Suprapto S(2),
(1) Teknik Sipil, Fakultas Vokasi, Universitas Negeri Surabaya,
(2) ,

Mail Corresponding Author
Article Analytic
  [File Size: 373KB]  Language: en
Available online: 2025-05-03  |  Published : 2025-05-03
Copyright (c) 2025 Mochamad Yusuf Al Ghozy
Article can trace at:

Article Metrics

Abstract Views: 160 times PDF Downloaded: 90 times

Abstract


The Unesa Petanque Field Development Project is an effort to improve sports facilities that support academic and non-academic activities. A pivotal element of this endeavor lies in the fabrication of steel frameworks, which necessitates a tailored approach due to spatial constraints and restricted machinery accessibility. This study aims to assess the implementation of the Box I technique in the assembly of steel frames, emphasizing its adaptability to on-site challenges, procedural execution, and installation integrity. The Box I method was chosen for its capacity to navigate space limitations and access difficulties while ensuring workplace safety. Employing a qualitative methodology, the research gathers insights through observation, interviews, and documentation. The results indicate that the Box I technique proficiently mitigates site-specific obstacles, optimizes operational efficiency, and guarantees precise and secure installation. Recommendations are made for the formulation of Standard Operating Procedures (SOPs) applicable to similar undertakings.

Keywords


Steel erection, Box I, Implementation Method

References


Adiasa, I., Achmad, A. M. F., Busri, N. K., & Rabbani, R. (2024). Analisis Six Sigma Dmaic Dalam Mengurangi Defect Struktur Atap Pipa Baja Pada Proyek Perluasan Terminal Bandara Internasional Lombok. Hexagon, 5(2), 115129.

Berdikari, A. J., Hartanto, A. B., & Andi, A. (2015). Inspeksi Fabrikasi Dan Ereksi Pada Konstruksi Baja Proyek Gedung P1-p2 Uk Petra Surabaya. Jurnal Dimensi Pratama Teknik Sipil, 4(2).

Basdian Kusnaidi. (2024). Metode Pelaksanaan Erection Struktur Gerbang Pipa Baja Proyek Politeknik Maritim Negeri Indonesia.

Deeconstech, (2024). Panduan Lengkap Metode Ereksi Struktur Baja Teknik Proses dan Keamanan Dalam Konstruksi Modern. (https://www.deeconstech.com/metode- ereksi-struktur-baja-dalam- konstruksi/?amp=1. Diakses 19 Mei 2024)

Destyarini, A., Hartono, W., & Sugiyarto, S. (2016). Analisis Perbandingan Penggunaan Perancah Baja Konvensional dan Perancah Baja Modifikasi. Matriks Teknik Sipil, 4(3).

Hariyanto, R. A., & Purwanto, D. (2017). Perbandingan Waktu, Biaya dan Kendala pada Ereksi Kuda-Kuda Baja Menggunakan Metode Box I dan Mobile Crane. Seminar Nasional Ilmu Terapan, 1(1), A210-1.

Memed Permadi Satriyo1. (2023). Pekerjaan Erection Bangunan baja. (https://www.slideshare.net/slideshow/42 9168001erectionbangunanbajappt/26140 4800 . Diakses 2023)

Kmsgroups, (2024). Proses Ereksi Struktur Baja. (https://kmsgroups.com/proses- ereksi-struktur-baja/on-going-project/. Diakses 2024)

Sukamto, D. D., Amarwati, A., & Karopeboka, B. (2024). Analisis Pemilihan Metode Pelaksanaan Untuk Produktivitas Erection Struktur Baja Stasiun Light Rail Transit Bekasi. Jurnal KaLIBRASI: Karya Lintas Ilmu Bidang Rekayasa Arsitektur, Sipil, Industri, 7(1), 4759


Refbacks

  • There are currently no refbacks.

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.